Electronic Product Industry Service
USB housing mold & tooling design services
2017-11-23 20:43  Visit:113
Price:Unfilled
Send inquiry
Model Number: JL-15154 Key Specifications/Special Features: 1. Cavity no.: single cavity or multiple cavity.2. Lead time: 25-40 days (normally 4 weeks).3. Cavity/core steel: ASSAB P20, 718, s316, H13, 8407 and NAK80.4. Mold base: LKM/FUTABA/HASCO/DME/Meusburger5. Mold base standard: LKM and HASCO or Meusburger standard.6. Runner: cold or hot runner7. Gate: A. cold runner: pin-point gate, submarine gate, direct gate, edge gate. B. hot runner: pin-point gate, direct gate, side gate, needle-valve.8. Mold packing: non-fumigation wooden case9. Production materials: ABS, PE, PMMA, PC, POM, PBT, PP, PA66.PPO, PVC, PET and more.10. Surface finish: polish, EDM marks, texture, supersonic welding. Shipping Information:
  • FOB Port: Shenzhen
  • Lead Time: 25 - 30 days
  • Units per Export Carton: 1
  • Export Carton Dimensions L/W/H: 100 × 100 × 100 Centimeters
  • Export Carton Weight: 2 Tons (UK)
Main Export Markets:
  • Western Europe
Message

TO: dgjinlong

E-mail:

Content:

Contact information
Comment
0